Skip to content

North Tyneside Steam Railway

Menu
  • Home
  • About Us
    • Our Story
    • History of our railway
    • Volunteer Testimonials
    • @northtynesiderailway Linktree
    • NTSRA Blog
  • North Tyneside Light Railway
  • Locomotives and Rolling Sock
    • Steam Locomotives
      • A. No. 5
      • Ashington No. 5
      • Killingworth Billy
      • Meaford No. 1
      • No. 69
      • No. 401 (Vulcan)
      • Sentinel No. 4
      • Pony
    • Diesel Locomotives
      • No. 03078
      • No. 08915
      • No. 10
    • Electric Locomotives
      • Tyne and Wear Metrocar 4001
      • Harton E4
      • No. 3267
    • Rolling Stock
  • Events
  • Donate
  • Get Involved
    • Membership
    • Volunteering
  • Visit and Contact Us
    • Ticket Prices
    • Directions and Contact Info

Donate

Donations to the North Tyneside Steam Railway Association go towards the general operating and maintenance of the Railway, overhauls and repairs of Association owned rolling stock, special events and more.

Please take a look through this page for specific fundraisers, or if you simply wish to make a general donation, please use our JustGiving link below:


Other Ways to Donate

BACS

Account name: North Tyneside Steam Railway Association
Sort Code: 20-62-09
Account Number: 53322386

Please use “Donation”, followed by your surname in the payment reference

Cheque

Payable to
North Tyneside Steam Railway Association

Send to:
Stephenson Steam Railway
Middle Engine Lane, NE29 8DX with this completed form.


What your money goes towards

Brake van No.951920 overhaul

The work was carried out in several stages, starting in January 2018.

The first stage was to clean and repaint the underframe (Fig. 1)

Once the underframe was cleaned and repainted, we could make a start on replacing the rotten wood. The main timbers of the van were originally mahogany, a timber much used in carriage construction because of its straight grain and freedom from knots. It is also much easier to work than teak. However, by 2018, many of the timbers were suffering from severe rot and needed replacement. Mahogany was not an option for us so we used Douglas Fir instead.

The replacement was carried out in four phases: South End, South End Veranda, North End and North End Veranda. 

6
12
11
10
9
3
7
8
4
2
1
5
PlayPause
previous arrow
next arrow

Figure 2 shows the South End with the cross member and uprights removed Both uprights and the cross member needed replacing and Figure 3 shows the replacement cross member. With the South End repaired, we could move onto the South End Veranda. Once again, the timbers were in poor condition needed replacement. Figure 4 shows the replacement timbers and Figure 5 shows them reassembled. Figure 6 shows the South End restoration nearing completion.

With the South End complete, the Brake Van was returned to service for a few months until we were ready to undertake the repairs to the North End.For convenience, we carried out the restoration of the North End and the North End Veranda at the same time. Figure 7 shows the North End disassembled. On the right hand side you can see distortion caused by corrosion to the solebar. This could not be removed, so a replacement side member had to be cut to fit around it. Figure 8 shows the condition of one of the original cross members. 

Figure 9 shows some of the replacement timbers for the North End. These were all cut from Douglas fir using the the machines in the Wood Shop – a bandsaw, table saw and a planer/thicknesser. Mortices were cut with a router and the squared up using chisels.

Figure 10 shows the North End re-assembled and awaiting replacement panels.

We also took this opportunity to replace the floor of the van, which had also rotted in several places, and to replace some of the planking to the inside of the van, see Figure 11.

With the wood work completed, the van was off to the paint shop for a complete repaint. Figure 12 shows some of the extensive work required.

At some time in the past, the van roof had been repaired with fibreglass. This was showing signs of pin holing so we painted with a glass fibre reinforced sealer.

Finally, Figure 13 shows the brake van completed and back in service.  


3a25df_3b0e326484e5416aa4af00f51c92f9d9~mv2
3a25df_3b7a5d66652548ada02be614b644f12d~mv2
3a25df_4c5003bcaf634646b053bc9782337c27~mv2
3a25df_4eea095f880c446da3684a15c3c5d4ff~mv2
3a25df_6f24793c5bdb415a9092aca25af9effe~mv2
3a25df_32a17048541c4d66b8924343ef379122~mv2
3a25df_56b2976580044528925f64b08cdff2b3~mv2
3a25df_73f4b4c6bf22465087b53b2870581e0f~mv2 (1)
3a25df_74cde0d735484cb6a56c70131c5552bd~mv2
3a25df_97ceca11e4c94210a55a7ecb7be08d1b~mv2
3a25df_87383f06cbc641d4b3c24ac9c35e1bcb~mv2
3a25df_1621631e5736473d8f5326d48d941e15~mv2
3a25df_055403137edc4c799154d9bb0024200d~mv2
3a25df_74512435096849bc97d6e24a63a892bd~mv2
3a25df_c018e086743a417fb42fb8ec0ceeab66~mv2
3a25df_cb4d30ce4f2246e29e1cf27c5b72b14c~mv2
3a25df_cffb663b2ab54bae90f90f9c7cc366a0~mv2 (1)
3a25df_d4ce71b21ade4e178ff296b84449392f~mv2
3a25df_f69b2e7f329242869e75235e842f107d~mv2
PlayPause
previous arrow
next arrow

30th Anniversary Gala 


In July 2021 the North Tyneside Steam Railway Association hosted the Railway’s 30th Anniversary Gala which saw two visiting locomotives come to the railway for a short staycation. With steaming fees and transport costs to be covered, the hiring of visiting steam locomotives is not cheap. Along with everything else that goes with organising a big event, we need donations in order to host events like our 30th Anniversary Gala again in the future.


Next Wagon Overhaul Project 


The NTSRA is looking to raise funds to overhaul the four-wheel flat wagon No.ZV 733728 as well as the former 5 ton General Goods Container and combine the two to replicate a British Railway’s Conflat wagon. Both the wagon and the container body require extensive bodywork and mechanical repairs to allow another important part of railway history to be recreated at the North Tyneside Steam Railway.

3a25df_ebd0f3fff2ff4e658855e97948ce1773~mv2
3a25df_fcc739b7c5224813873464c49d567920~mv2
PlayPause
previous arrow
next arrow

1df221_6d547c5af6a74509be36e0f3a4c80a82~mv2
1df221_d5387d81e11141b9a2b91780bfcd9686~mv2
PlayPause
previous arrow
next arrow

Consett Number 10‘s New Batteries


A huge thank you to everyone who donated to help Consett No.10! Your support made it possible for the locomotive to run for our Rail200 event this year, and your contributions directly funded the replacement of her batteries—bringing the massive Mirlees Blackstone engine back to life.

No. 10 remains a rare and fascinating sight on the rails. Because she’s seldom used, our dedicated volunteers were able to take her into the main workshop for a full re-wire and overhaul. With the new batteries in place, she’s ready for action, and the next stage will be a cosmetic overhaul and ongoing maintenance to ensure No.10 stays in top condition and continues to delight visitors for years to come.

Every donation, large or small, helps preserve this unique piece of rail history—thank you for keeping No.10 running!


Remember that every donation, big or small, makes a real difference. Your support helps keep the North Tyneside Steam Railway running, preserves our unique locomotives, and ensures visitors can enjoy our heritage for years to come.

This image has an empty alt attribute; its file name is image-3.png

Archives

Meta

  • Log in

©North Tyneside Steam Railway 2026
Registered Charity Number: 508092